Flat, timed right and ready for flooring

Concrete floor installation in Davis means forming, pouring and finishing a new slab for an addition, shop, studio or room. Most calls come when a new space needs a floor that's flat and ready for what goes on it. I start by asking what that is, because it decides what goes underneath.

A large, freshly finished concrete floor with expansion joints fills an empty steel-framed warehouse.

Concrete floor installation starts with what goes on top

A concrete floor is either the finished surface you walk on or the base for tile, wood or a coating. Size, thickness, steel and base work move the price, and curing and drying time move the schedule, so the walk-through gives you your own number.

We're based in Davis and pour floors in the cities around it, from Woodland and Winters out to Roseville and Elk Grove. If the floor is also the house's foundation, that's slab foundation building.

Best for

  • New additions and rooms
  • Shops and studios
  • Floors getting tile or wood
  1. The base comes first

    The base is buried by lunch on pour day, so it's the first thing people want to cut. I'd cut somewhere else, because a slab settles with whatever it sits on.

  2. Planned for your flooring

    We talk through what goes on top before we pour, because that decides which barrier goes underneath and how long the slab needs to dry.

  3. A flat, hard top

    Finishing gets timed to the concrete, not the clock, because rushed or late troweling leaves a dusty surface and high and low spots under your flooring.

  4. Cracks where we planned

    We saw-cut control joints, shallow grooves that give shrinking concrete a place to crack, on time, so cracks follow our lines instead of picking their own.

Stone-faced outdoor steps descend from a paved patio with black metal railings and seating nearby.

Concrete floors that hold up start before the pour

  • I do the walk-through and the estimate myself, our crew lead runs the work on site, and I'm there for the pours.
  • We've been doing this since 2013, and years before that running crews for another contractor taught me most floor problems start before the truck shows up.
  • We're licensed and fully insured, so the crew building your floor is covered from the first form board to the last saw cut.

Ways to build your concrete floor

I walk the space with you, ask what the floor has to carry and what goes on it, and we pick from there.

  • Finished concrete

    Troweled smooth and left as the floor itself, which suits shops, studios and rooms where you want a hard, simple surface.

  • Base for flooring

    Poured flat and left to dry for tile, wood or a coating, when the slab disappears under something else.

  • Reinforced with rebar

    Steel bars inside the slab hold cracks tight, which is worth it under heavy loads or where the ground moves a lot.

  • Thicker slab

    Extra depth for heavy equipment, vehicles or a workshop floor, where a standard home slab would be working too hard.

Tell us about your floor

Send the floor's size, what it's for and the flooring planned on top. We reply within one business day and set up a free, no-obligation estimate on site.

Concrete floor questions we hear

How much does a concrete floor cost in Davis?

A reinforced concrete slab in the Sacramento area usually costs about $8 to $14 per square foot, by one local cost guide, and that's the area's going rate, not our quote. The same guide says reinforced slabs run a bit more than plain pads, and home floors run four to six inches thick, with garages at the thicker end.

How soon can you walk on a new concrete floor?

About 48 hours, by one Sacramento cost guide, with a week's wait safer for heavy loads and full cure at 28 to 30 days. Curing is the concrete slowly gaining strength, and it keeps going long after the floor looks done, so plan foot traffic first and heavy furniture or equipment later.

What goes under a concrete floor slab in a house?

A vapor barrier, a sheet that blocks ground moisture, and the industry floor guide says it protects flooring best right against the slab. That spot takes extra care, since the slab settles and moves more as it dries. The guide also says old-style plain plastic sheeting falls short, so ask which material a crew plans to use.

How long before I can put flooring on a new concrete slab?

Longer than it takes to walk on, and how much longer depends on the slab and what's around it. The industry floor guide says wet or soaked fill left above the vapor barrier can greatly stretch drying time before flooring, adhesives or coatings go down. We plan for that around your flooring before the pour.

Will a new concrete floor crack in Davis clay soil?

Some cracking is normal, because concrete starts shrinking the day it's poured, so the aim is cracks along the joints we cut. Yolo County soil rates high for swelling and shrinking, so ask any contractor how they prepare the ground. We dig out and pack the subgrade, the ground the slab sits on, instead of raking it level.

Who can legally pour a concrete floor in California?

A contractor licensed in the state licensing board's concrete class, which covers forming, pouring and finishing flat concrete. A general builder can take it on if they hold that class or hire someone who does, so ask which. Unlicensed work is allowed only under $1,000, when it needs no permit and the person hires no one.

Other concrete work we do

All services

Call before you book the flooring

Tell us when the tile or wood goes in, since curing and drying set our pour date. Call (530) 298-8067 or use the form.

Call(530) 298-8067